Lenze EtherCAT Controller-based Automation User Manual Page 160

  • Download
  • Add to my manuals
  • Print
  • Page
    / 205
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 159
11 Defining the cycle time of the PLC project
11.1 Determining the task utilisation of the application
160
Lenze · Controller-based Automation · EtherCAT® Communication Manual · DMS 6.4 EN · 04/2014 · TD17
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
11 Defining the cycle time of the PLC project
This chapter provides information on how to ...
•die Determining the task utilisation of the application
( 160);
•das Optimising the system
( 162).
11.1 Determining the task utilisation of the application
In the online mode, the Monitor tab of the Task Configuration shows current status details and
measurements of the cycles, cycle times, and jitters of the tasks contained.
The values are updated in the same time interval as that used for monitoring the values from the
controller.
If the cursor is on a task name field, the values displayed can be reset to 0 by the Reset context menu
command (right-click the task name field).
Page view 159
1 2 ... 155 156 157 158 159 160 161 162 163 164 165 ... 204 205

Comments to this Manuals

No comments