Lenze ELCAFHIxxx4E34NNER Highline User Manual Page 78

  • Download
  • Add to my manuals
  • Print
  • Page
    / 79
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 77
Final works
Installation check
5
l
78
EDKLCFH1134−EER DE/EN 1.0
5 Final works
5.1 Installation check
) Note!
Please observe during transport, storage and operation:
ƒ Cover unused connectors for control connections and interfaces with the
plastic covers provided to preserve the certified safety technology features.
Check that all connectors are properly locked in order to ensure trouble−free operation.
5.2 Preparing the commissioning procedure
For commissioning you require the following:
ƒ A computer with Windows® operating system (XP or 2000)
ƒ The Lenze PC software »Engineer«
ƒ A connection to the controller via an interface, e.g.:
– Diagnostic interface X70 with USB diagnostic adapter
– PROFIBUS
ƒ The Software Manual for the technology application used
ƒ The Communication Manual for the automation platform network
ƒ 24 V voltage supply for control electronics of the controller
Follow the software instructions and/or read the documentation.
Page view 77
1 2 ... 73 74 75 76 77 78 79

Comments to this Manuals

No comments